PROJECTS

DALHOUSIE AGRICULTURAL CAMPUS – HALEY BUILDING
VENTILATION UPGRADE

◈ Rooftop ductwork from existing fume hoods to new Greenheck exhaust fans

 

Rooftop ductwork from existing fume hoods to new Greenheck exhaust fans

SCOTIA POOLS – HVAC RETROFIT

◈ New Dectron Unit c/w exterior insulated
◈ Ductwork tied into the existing ventilation
◈ This unit also pre-heats the pool water.

New Dectron Unit c/w exterior insulated ductwork tied into the existing ventilation. This unit also pre-heats the pool water.

BIBLE HILL – PRIMARY TO GRADE 4 SCHOOL

◈ Main Corridor Duct
◈ Domestic Hot Water Heating
◈ Water Entrance

Main Corridor Duct